Balance Bridge Works & Slope Protection

Construction of balance work at Bridge No.81, 82, 85-A, 87-A (RCC Box) and Slope Protection works in Sangaldan Yard on Katra-Daram Section of Udhampur-Srinagar-Baramulla Rail Link Project, Jammu & Kashmir

Read More »

2-Lane ROB Construction

Construction of proposed 2-lane ROB and its approaches in lieu of existing level crossing No.414 at Km 33.100 (railway Ch.730/11-13) on NH 326A in the state of Andhra Pradesh

Read More »

Mirzapur–Basethi Rail Project

Earthwork in embankment, blanketing, construction of minorbridges, RUB, LHS and other allied misc. works between Mirzapur (Excl.) to Basethi (Incl.) i.e. fromKm 9.0 to Km 19.0 in connection with constructionof

Read More »

Earthwork, Bridges & RUB Works

Earthwork inembankment, blanketing, construction of minorbridges, RUB, LHS and other allied misc. worksbetween Basethi station (Excl.) to Raniganj station(Incl.) i.e. from Km 19.0 to Km 28.0 in connectionwith construction of

Read More »

Hadihalli–Belur Rail Line Project

Construction of new broad gauge railway line between hadihalli (Excl.) (54880) and belur (Incl.)(64480) (11.60 Km) under Kadur- Chikkamagalur – Belur new line project including general electrical and electrification works.

Read More »

Railway Bridge & Earthwork Works

Construction of minor bridges, earth work, blanketing, LHS & RUB between Pipurauli (Excluding) Ch No. 88620 to Unwal (Including) Ch No. 106660 in connection with Shajanwa – Dhorighat new railway

Read More »

MMTS Phase-II Extension

Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers); S&T; OHE & General Electrical Works in connection with Extension of MMTS Phase-II from

Read More »