Balumath–Murpa–Lapra Road Reconstruction
Re-construction work of Balumath-Murpa-Lapra Road (MDR-143) (Total Length-23Km)
Re-construction work of Balumath-Murpa-Lapra Road (MDR-143) (Total Length-23Km)
DESIGN AND CONSTRUCTION/ IMPROVEMENT OF BALIPARA-CHARDUAR -TAWANG ROAD FROM KM 173.240 TO KM 183.00 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH
Widening /reconstruction of existing Pavement to Two lane with paved shoulder from Km 60.50 to Km 79.00 of NH-99 in the State of Jharkhand under EPC mode.
Widening and Strengthening/Reconstruction work of Mirzachouki-Boarijore Road from KM. 0.00 to 16.97 under Road Division Sahibganj for the year 2022-23.
Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield)
Strengthening/Reconstruction of Ramuna to manjhiaon Road (Km. 0.00 to 29.300) under R.C.D., Road Division, Garhwa
Construction of Two lane road on NH specifications from Paletwa to Zorinpui at India – Myanmar Border in Chin state of Myanmar having length of approx 109.2 Km
Construction of two lane with hard shoulder of Kohima-Jessami Road onNH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 (near Chakahabama) [ Design Km 7.88
(R&B) National Highways- Construction of Proposed Four Lane ROB and subway in lieu of LC No.LC-17 at km.108/1-2 between Jamalamadugu & Proddutur station on Nandyal-Yerraguntla section at Km 563/200 of
Package No. 47/aprrp/PRED/ATP/ROADS/003 – Consists of Road works in Singanamala Tadipatri and Guntakal Constituency in ananthapur District – work closed