
Package No. 49/APRRP/PRED/ATP/ROADS/005
Package No. 49/aprrp/PRED/ATP/ROADS/005 – Consists of 44 road works in Madakasira and Kalyandurga Constituency in ananthapur District

Package No. 49/aprrp/PRED/ATP/ROADS/005 – Consists of 44 road works in Madakasira and Kalyandurga Constituency in ananthapur District

Lohara-Rengadabri-junapani-Chouki Road section from Existing Chair 42.0lO(Design Chainage from Km 0.000 to Km 41. 983) In the state of Chhattisgarh on Engineering procurement EPC Mode

Strengthening/Reconstruction of Ramuna to manjhiaon Road (Km. 0.00 to 29.300) under R.C.D., Road Division, Garhwa
Construction of 3 no. of Bypasses at Sheikhpura, Jamui & Khaira along with 1 no. of realignment at Sikandra with pre-construction activity (total length-13.472 Km) to two lane with paved

4- Laning of Haridwar-Nagina Section of NH 74 (km 0.00 to km 73.00 (Design Chainage 0.00 to km 71.614) in the State of Uttarakhand and Uttar Pradesh on EPC mode

Construction of Berhampur Ring Road from 0/000 km to 12/300 Km in the district of ganjam in EPC mode

Development of six lane of Chittoor-Thachur Highway from Km.96+040 (Pondavakkam) to Km. 116+100 (Kannigaipair) of NH-7168 on HAM under Bharatmala Pariyojna in the state of Tamil Nadu (Pkg-4).

Rehabilitation and Upgradation of NH-167 from Design km.157.707 (Alinagar) to km. 187.723 (Miryalaguda) to Two lane with paved shoulders in the state of Telangana on Engineering, Procurement & Construction (EPC)

Construction of Two lane road on NH specifications from Paletwa to Zorinpui at India – Myanmar Border in Chin state of Myanmar having length of approx 109.2 Km

(R&B) National Highways- Construction of Proposed Four Lane ROB and subway in lieu of LC No.LC-17 at km.108/1-2 between Jamalamadugu & Proddutur station on Nandyal-Yerraguntla section at Km 563/200 of