Canal Extension & Supply Channel Works
Extension of Canal and supply channel from MP north canal to Chagallu barrage from Km 0.000 to 19.000
Extension of Canal and supply channel from MP north canal to Chagallu barrage from Km 0.000 to 19.000
Investigation , preparation of Hydraulic particulars, Designs & Drawings of earthwork excavation of HNSS Kuppam Branch Canal from Km 0.000 to Km 143.900 including construction of CM & CD works
Megha Engineering & Infrastructures Ltd. (Gross)
HNSS Project Phase-II Package No.20A-Investigation, Preparation of HP’s, Designs, Drawings, Earthwork and construction of tunnel in complete shape including lining on HNSS Main canal from KM 506.000 to KM 511.000
“Remodelling of Murki Nala (Pll & P12) from Ch.8220 to Ch.8964 at Yakutpura Badabazar Bridge to Dabeerpura Flyover
Remodelling of Gurramcheru Nala (P8) from Ch:1310 to 2340 at Naseeb nagar and Shivaji nagar under JnNURM – Muriki nala Gurramcheru Nala (P8)
AVR HNSS Project-Package No.26A-All balance works in AVR HNSS Main canal from Km 64.000 to Km 76.325/77.000 including formation of Krishnagiri Reservoir including construction of structures and distributory system to
HNSS Phase – II Madanapalli – Progress on pump houses M1,P11,12,13,14 & distributory system
Package No. 14, LANCO Work – Sub Contract to RK
HNSS Project- Phase II Works- Investigation, Preparation of HPs, Design, Excavation, Construction of CM & CD works of HNSS Main Canal reach from Km.380 to 400 and also for distributory