HNSS Phase-II Package-18
“Investigation preparation of Hydraulic particulars designs drawings excavation and consturction of CM and CD works of Hnss main canal reach from km 463.000 to km 490.000 under Hnss phase-II in
“Investigation preparation of Hydraulic particulars designs drawings excavation and consturction of CM and CD works of Hnss main canal reach from km 463.000 to km 490.000 under Hnss phase-II in
HNSS Project -Package No.19- Pioneer Builders work – sub contract to RK
“WRD-PIPLMC Package-8 – Concluding detailed Investigation, Preparation of Hydraulic Particulars, Designs and Engineering preparation of Estimates and excavation of PIPLMC from Km 162.409 to Km 177.809 (including new irrigation and
Re-construction work of Balumath-Murpa-Lapra Road (MDR-143) (Total Length-23Km)
DESIGN AND CONSTRUCTION/ IMPROVEMENT OF BALIPARA-CHARDUAR -TAWANG ROAD FROM KM 173.240 TO KM 183.00 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH
Widening /reconstruction of existing Pavement to Two lane with paved shoulder from Km 60.50 to Km 79.00 of NH-99 in the State of Jharkhand under EPC mode.
Widening and Strengthening/Reconstruction work of Mirzachouki-Boarijore Road from KM. 0.00 to 16.97 under Road Division Sahibganj for the year 2022-23.
Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield)
Strengthening/Reconstruction of Ramuna to manjhiaon Road (Km. 0.00 to 29.300) under R.C.D., Road Division, Garhwa
Construction of Two lane road on NH specifications from Paletwa to Zorinpui at India – Myanmar Border in Chin state of Myanmar having length of approx 109.2 Km